Skip to main content
  • Home
  • About
  • Faculty Experts
  • For The Media
  • ’Cuse Conversations Podcast
  • Topics
    • Alumni
    • Events
    • Faculty
    • Students
    • All Topics
  • Contact
  • Submit
Campus & Community
  • All News
  • Arts & Culture
  • Business & Economy
  • Campus & Community
  • Health & Society
  • Media, Law & Policy
  • STEM
  • Veterans
  • University Statements
  • Syracuse University Impact
  • |
  • The Peel
  • Athletics
Sections
  • All News
  • Arts & Culture
  • Business & Economy
  • Campus & Community
  • Health & Society
  • Media, Law & Policy
  • STEM
  • Veterans
  • University Statements
  • Syracuse University Impact
  • |
  • The Peel
  • Athletics
  • Home
  • About
  • Faculty Experts
  • For The Media
  • ’Cuse Conversations Podcast
  • Topics
    • Alumni
    • Events
    • Faculty
    • Students
    • All Topics
  • Contact
  • Submit
Campus & Community

Adams Street, University Avenue Sidewalk Closure Planned for University College Window Replacement

Friday, November 6, 2020, By News Staff
Share

Campus Planning, Design and Construction is overseeing a window replacement project at University College. Intermittent sidewalk closures surrounding University College are required to perform the work safely. The work will begin Monday, Nov. 9, and continue through the end of December. The sidewalk closures will take place between 6 a.m. and 5 p.m. Monday through Friday as required.

One closure will be on the south side of Adams Street, just west of the University Avenue intersection, and the other closure will be on the west side of University Avenue, just south of the Adams Street intersection. These closures will not occur every day, but more likely a few days each week.

Signage will be placed at nearby intersections informing pedestrians of the closure and where to cross the road.

We appreciate your patience as there will be construction noise generated at times, as well as disruptions to pedestrian pathways. For everyone’s safety, you are encouraged to remain alert in work areas and follow detours.

Delays in the proposed work may occur as a result of weather and/or unforeseen circumstances. In the event that there is a significant delay, Campus Planning, Design and Construction will issue revised information as soon as possible.

Please contact Doug Tankersley, at 315.447.8660 or dtankers@syr.edu, with any questions or concerns.

  • Author

News Staff

  • Recent
  • Syracuse Stage Announces Cast and Production Team of Musical ‘The Hello Girls’
    Friday, August 8, 2025, By Joanna Penalva
  • Expert Available for New Tariffs on India
    Friday, August 8, 2025, By Ellen Mbuqe
  • Syracuse Views Summer 2025
    Friday, August 8, 2025, By News Staff
  • Sport Management Professor Calls Historic First in MLB ‘Overdue’
    Thursday, August 7, 2025, By Keith Kobland
  • Scott Tainsky’s Research Focus Aligns Perfectly With New Falk College of Sport
    Thursday, August 7, 2025, By Matt Michael

More In Campus & Community

Scott Tainsky’s Research Focus Aligns Perfectly With New Falk College of Sport

The earliest memories Scott Tainsky has involve playing sports and watching the golden age of Big East Conference basketball with stars like Patrick Ewing, Chris Mullin and Syracuse University star Pearl Washington. Now, as a father of two children who play…

Maxwell School Honors Alumnus Elliot Stamler ’60 With Cramer Horizon Award

The latest recipient of the Maxwell School’s Cramer Horizon Award has embodied the ideals of its namesakes, Gerald ’52, H’10 and Daphna Cramer, through his professional endeavors, philanthropy and commitment to engaged citizenship. Throughout his remarkable career, honoree Elliot J….

Whitman School Honored for Mental Health Excellence

The Whitman School received the 2025 Excellence in Mental Health and Well-Being Award from Insight into Academia magazine, a measure of an institution’s individual programs and initiatives that significantly advance the core values of inclusive excellence and belonging through programs,…

Construction Continues at Stadium Place, Center Crosswalk to Close Aug. 8

Campus Planning, Design and Construction, CenTrio Energy, and local contractors are continuing their work on the campus steam distribution system in the West Campus area. To continue necessary sidewalk replacements along the east boundary of the Raynor Avenue lot, the…

Whitman School Celebrates Record Fundraising Year, Builds Momentum for Transformation

As institutions of higher education adapt to rapid changes and evolving student needs across the country, alumni, parents and donors of the Martin J. Whitman School of Management have responded with record-setting philanthropic support and engagement. Their historic commitment continues…

Subscribe to SU Today

If you need help with your subscription, contact sunews@syr.edu.

Connect With Us

  • X
  • Facebook
  • Instagram
  • Youtube
  • LinkedIn
Social Media Directory

For the Media

Find an Expert Follow @SyracuseUNews
  • Facebook
  • Instagram
  • Youtube
  • LinkedIn
  • @SyracuseU
  • @SyracuseUNews
  • Social Media Directory
  • Accessibility
  • Privacy
  • Campus Status
  • Syracuse.edu
© 2025 Syracuse University News. All Rights Reserved.