Skip to main content
  • Home
  • About
  • Faculty Experts
  • For The Media
  • ’Cuse Conversations Podcast
  • Topics
    • Alumni
    • Events
    • Faculty
    • Students
    • All Topics
  • Contact
  • Submit
Campus & Community
  • All News
  • Arts & Culture
  • Business & Economy
  • Campus & Community
  • Health & Society
  • Media, Law & Policy
  • STEM
  • Veterans
  • University Statements
  • Syracuse University Impact
  • |
  • The Peel
  • Athletics
Sections
  • All News
  • Arts & Culture
  • Business & Economy
  • Campus & Community
  • Health & Society
  • Media, Law & Policy
  • STEM
  • Veterans
  • University Statements
  • Syracuse University Impact
  • |
  • The Peel
  • Athletics
  • Home
  • About
  • Faculty Experts
  • For The Media
  • ’Cuse Conversations Podcast
  • Topics
    • Alumni
    • Events
    • Faculty
    • Students
    • All Topics
  • Contact
  • Submit
Campus & Community

Message to Campus Community from Pete Sala

Wednesday, May 25, 2016, By News Staff
Share

Dear Students, Faculty and Staff:

With the end of the school year behind us, the start of summer is here at Syracuse University. While some of us are headed home or are ready to embark on a variety of summer activities, many of you will remain here on campus for the summer months.

With that in mind, I write today to inform you that a number of campus improvement projects, all of which are designed to align the University’s Academic Strategic Plan with its physical framework, will begin in the coming weeks, and will have some impact on pedestrian and car traffic.

In particular, plans are underway to transform University Place into a dynamic pedestrian promenade. This promenade will connect a series of plazas, including Bird Library, the Schine Student Center and the Newhouse School complex. Once complete, it will transform the area from a congested thoroughfare to a pedestrian-friendly promenade featuring activated plazas, improved landscaping, increased ADA accessibility and a greater sense of physical connectedness for all members of the campus community.

In preparation for the project, a large portion of University Place—from College Place to South Crouse Avenue—will be closed beginning Tuesday, May 31, to all vehicular traffic, with the exception of police, fire, emergency and maintenance vehicles. Traffic will be rerouted as a result, and comprehensive signage communicating detours will be prominently displayed. While this work might affect the route some of you take to your parking lots, only the Quad 2 Lot will be closed for a portion of this project.  A new drive lane to the Quad 2 Lot from College Place will be immediately constructed, and open in mid-June. Each individual who parks in Quad 2 has already been personally notified of this change. Access to all other parking lots will remain the same.

Additionally, beginning Friday, June 3, existing bus routes that utilize University Place will be rerouted to Comstock Avenue and Waverly Avenue. Prior to the closure of University Place, curbside signage will be installed at both the new and existing bus stop locations. Further information will be distributed about the bus route changes and can be found on the Centro website.

Ensuring accessible routes during construction is very important. Therefore, during the Quad 2 Lot construction, accessible access to Link Hall will be available through Slocum Hall. Also, a temporary sidewalk will be installed at the accessible entry to Lyman Hall during construction to allow for the installation of a permanent accessible walkway. Signage will be prominently displayed. If you have any questions regarding accessibility, please contact Aaron Hodukavich, Director and ADA Coordinator in the Office of Equal Opportunity, Inclusion and Resolution Services, at 315-443-2377 or ajhoduka@syr.edu.

I recognize many of you will be temporarily affected by this work, but I am pleased to inform you that these summer projects will essentially be complete by Monday, August 22, well before the start of the new academic year.

I want to thank you now for your patience, understanding and flexibility as these projects get underway. These projects advance the goals established by the Campus Framework Advisory Group, including supporting academic excellence, enriching all aspects of student life and creating a vibrant campus setting.

My team and I are excited to get started on these projects, but as always, we welcome and encourage your feedback. Also, please be sure to visit our website regularly over the next several months. We will provide ongoing updates and progress reports on this project and other improvement work being done on campus this summer.

If you have any questions, comments or suggestions about this phase of construction, please don’t hesitate to contact Jim Blum, project manager, at jpblum@syr.edu. And, if you have any questions about parking, please call Parking and Transit Services at 315-443-4652.

Sincerely,

Pete Sala
Vice President & Chief Campus Facilities Officer

  • Author

News Staff

  • Recent
  • Studying and Reversing the Damaging Effects of Pollution and Acid Rain With Charles Driscoll (Podcast)
    Wednesday, May 14, 2025, By John Boccacino
  • Alumnus, Visiting Scholar Mosab Abu Toha G’23 Wins Pulitzer Prize for New Yorker Essays
    Wednesday, May 14, 2025, By News Staff
  • Utility Projects to Begin on Campus This Week; Temporary Closures and Detours Expected Throughout the Summer
    Monday, May 12, 2025, By Jennifer DeMarchi
  • Student Speaker Jonathan Collard de Beaufort ’25: ‘Let’s Go Be Brilliant’ (Video)
    Monday, May 12, 2025, By Kathleen Haley
  • Chancellor Syverud Addresses Graduates at Commencement Ceremony (Video)
    Monday, May 12, 2025, By News Staff

More In Campus & Community

Live Like Liam Foundation Establishes Endowed Scholarship for InclusiveU

Syracuse University has received a $100,000 endowed scholarship from the Live Like Liam Foundation in support of the School of Education’s InclusiveU program. This meaningful gift will expand access to the University’s flagship program for students with intellectual and developmental…

Dara Drake ’23 Named the University’s First Knight-Hennessy Scholar

Alumna Dara Drake ’23 has been named as a 2025 Knight-Hennessy Scholar, the first from Syracuse University. Knight-Hennessy Scholars is a multidisciplinary, multicultural graduate scholarship program at Stanford University. Each Knight-Hennessy scholar receives up to three years of financial support…

Years of Growth Fueled Women’s Club Ice Hockey Team to Success

The trajectory of the Syracuse University women’s club ice hockey team is what Hollywood makes movies about. “When I joined [in Fall 2021] there were only six other people on the team,” says Amanda Wheeler, a senior at SUNY College…

Utility Projects to Begin on Campus This Week; Temporary Closures and Detours Expected Throughout the Summer

Numerous site and utility projects will be completed on campus this summer, with work undertaken by University, CenTrio and New York State Department of Transportation (NYSDOT) contractors. These projects are related to improving electrical infrastructure, the steam distribution system and…

Student Speaker Jonathan Collard de Beaufort ’25: ‘Let’s Go Be Brilliant’ (Video)

University Scholar Jonathan Collard de Beaufort ’25 looked back on all that the Class of 2025 has accomplished and acknowledged what it took to get to Commencement. “I’m here as one of 12 University Scholars, yet I know every single…

Subscribe to SU Today

If you need help with your subscription, contact sunews@syr.edu.

Connect With Us

  • X
  • Facebook
  • Instagram
  • Youtube
  • LinkedIn
Social Media Directory

For the Media

Find an Expert Follow @SyracuseUNews
  • Facebook
  • Instagram
  • Youtube
  • LinkedIn
  • @SyracuseU
  • @SyracuseUNews
  • Social Media Directory
  • Accessibility
  • Privacy
  • Campus Status
  • Syracuse.edu
© 2025 Syracuse University News. All Rights Reserved.